1 October 2024: Version 4.0
The pattern in English has been updated with a new format, unisex size-inclusive grading, written instructions for all charts, and new imagery.
18 April 2017: Version 3.1
On page 13, the last paragraph of Left Collar Shaping Sequence B should read:
Upon completion of this section, you will have worked Left Collar Shaping Sequence B 14 times; you now have 57 stitches on your needle.
23 January 2014: Version 3.0
On page 13, under Left Collar Shaping Sequence B, the first 3 stitches have been corrected to read:
“Collar Row B2 (WS): Knit 3, purl 1, knit 2, slip marker, work in established rib to next marker, slip marker, knit 2, purl 3.”
30 October 2013: Version 2.1
The Sleeve cuff measurements were missing on the Schematic and have now been added.
28 August 2013: Version 2.0
Page 6 Column 2 (end) adjusted as follows:
Work as established, repeating Hem Rows 1 & 2 until piece measures 2 1/2″ from cast-on edge, ending with a RS (WS, RS, WS) row.
Sizes 43 3/4 and 53ʺ only:
Place a marker at center of work [after 127 (–, 147, –) stitches].
Next Row (WS): Work in established rib to 4 stitches before marker, p2tog, SSK, remove marker, k2tog, SSP, work in established rib to end. [4 stitches decreased; 250 (–, 290, –) stitches remain]
Page 7 Column 1 (top), adjusted as follows:
All Sizes Resume: Divide Body and Bands
Body Setup Row 1 (RS): Knit 2, purl 1, slip 1 with yarn in back, *purl 2, knit 2; repeat from * 3 more times.
Place the 20 stitches just worked onto waste yarn or a stitch holder (these are your Right Band stitches and will be worked later). Continue across row as follows: Work Row 1 of Right Front Setup Chart once (working increases as indicated), place marker (Marker A), purl 4 (5, 7, 9), M1P, purl 6 (16, 13, 28), M1P, [purl 2 (–, 7, –), M1P] 2 (–, 2, –) times, purl 0 (5, 0, 9), place marker (Marker B), work Row 1 of Back Setup Chart once (working the bracketed motif 3 times, and working increases as indicated), place marker (Marker C), purl 0 (5, 0, 9), [M1P, purl 2 (–, 7, –)] 2 (–, 2, –) times, M1P, purl 6 (16, 13, 28), M1P, purl 4 (5, 7, 9), place marker (Marker D), work Row 1 of Left Front Setup Chart once (working increases as indicated). Place the final 20 stitches of row onto waste yarn or a stitch holder (for Left Band). [40 stitches have been placed on hold; 19 (15, 19, 15) stitches have been increased; 229 (249, 269, 289) stitches now on needle.